Today was a very productive day. In between watching the final round of the US Open in HD on a 46" LCD screen in Bay 2, we put up all of our new way finding signage. Now there's no excuse if you can't find a bathroom on either side of the building. The signage looks good, the colors fit well and we'll see how well people find their way around.
Dennis also hung up the LCD screen in the lobby. Showing samples of our work as guests & clients come in the building is always a nice way to welcome people. Having cable TV, something we didn't have at the old place, will also be nice to catch up on the hurricane coverage starting in about a month. Hopefully we won't use it for that too much.
Unfortunately, we came to the realization today that there is one thing some of us really miss from the old building, parking in a covered parking garage. Getting in to a car parked in direct sun light after 8 hours of sitting in 110 degree heat index is not a fun thing. Oh well, we'll survive.
Monday, June 22, 2009
Friday, June 19, 2009
Parking Sign & Bay 4
As I have mentioned before, we have a problem with clients & guests coming to our building, parking and then walking to our back door instead of our front door. So we had to get a sign made directing people to the front door rather than the back (locked) doors. The sign was installed today so hopefully that will cut down on people banging on our back doors. Pictures of the sign are on our new home website www.ideasorlando.com/ideasnewhome. Click on the photos tab then look on 6-19-09.
We also finished the redesign of Bay 4 today so the three edit suites we were redesigning, Bay 1, Bay 2 & Bay 4 are completed. The rooms look great and they will be much more client friendly.
We also finished the redesign of Bay 4 today so the three edit suites we were redesigning, Bay 1, Bay 2 & Bay 4 are completed. The rooms look great and they will be much more client friendly.
Bay 2 & Dry Erase Boards
We received the remaining piece of furniture for the redesign of Bay 2 yesterday so the room is completed and feels great, just like Bay 1 when we finished it last week. Speaking of Bay 1, yesterday we had our first outside client in the room since we did the redesign. The great thing about this is that the client was also in the room before the redesign so they could do the comparison. I walked in during their session and asked how they liked it and both of the clients said it was very comfortable and user friendly. One client was sitting up next to Sam and the other was at the back client desk. Both had papers all over and had plenty of room to work. Mission accomplished in Bay 1 and we think the same for Bay 2. We have the furinture for Bay 4 also so we'll be changing that out today or Monday as well.
The long await for our clear dry erase boards is now over. They arrived yesterday, 40 of them. We are doing a couple tests to see what the best way to mount them is. We want to have them removable from the wall if people want to change a picture, put something else up, or if it's just easier for them to write on them. But, we also need them to be stable enough hanging so they don't fall down with a stiff breeze and we also don't want them tearing up the walls. We think we may have found a way to achieve all those goals, we should know by the end of the day. If that's the case, we'll start putting them up Monday.
The long await for our clear dry erase boards is now over. They arrived yesterday, 40 of them. We are doing a couple tests to see what the best way to mount them is. We want to have them removable from the wall if people want to change a picture, put something else up, or if it's just easier for them to write on them. But, we also need them to be stable enough hanging so they don't fall down with a stiff breeze and we also don't want them tearing up the walls. We think we may have found a way to achieve all those goals, we should know by the end of the day. If that's the case, we'll start putting them up Monday.
Thursday, June 18, 2009
Another Good Day
Yesterday was a good day. The second of our LCD screens was mounted in Bay 2. Now Bay 1 & Bay 2 have matching Samsung LCD screens. We already have one of our plasma screens mounted in the machine room so we have mounting to do in the lobby, lounge and Bay 4 left. While Dennis was mounting in Bay 2 yesterday he also did a massive clean up of the cables for the edit suite so the room looks really polished now. All we need is the last piece of furniture and that room is totally completed.
Our interior way finding signage also also arrived yesterday. It's currently flattening on our pool table, then Millo wants to do some trimming of a few of them then they'll be ready for install. Hopefully Monday we'll start putting them up. But they look cool and in a company full of creative people with lots of opinions, it's great that everyone was very complimentary about all of the signs.
We also had another good day of people seeing the building for the first time. Hearing people talk about how much they like the building when they see it for the first time never gets old.
Our interior way finding signage also also arrived yesterday. It's currently flattening on our pool table, then Millo wants to do some trimming of a few of them then they'll be ready for install. Hopefully Monday we'll start putting them up. But they look cool and in a company full of creative people with lots of opinions, it's great that everyone was very complimentary about all of the signs.
We also had another good day of people seeing the building for the first time. Hearing people talk about how much they like the building when they see it for the first time never gets old.
Tuesday, June 16, 2009
Final Cut Pro & Fabric Panels
Since the move, our Final Cut Pro system has been, we'll call it temperamental. Dennis has been working almost daily for the last 2 weeks figuring out what the problems was. First was determining whether it was the Mac or whether it was Final Cut. Considering Final Cut wouldn't even load for a bit Dennis started with the computer. After finding a couple things out of whack the computer overall seemed to be working right so it was on to dealing with Final Cut. After seeing issues with the software we went back & fourth whether the problem was the computer or the software. It appears, and I emphasize appears until we see it for sure, that the problem may be the mother board. A new one will be in Thursday and we'll see what happens.
Duncan, bless his heart, put up 6 gray fabric panels in the edit suites yesterday. The acoustics in the new edit suites are surprisingly good already so the panels should only improve it more. And with the precision needed to do the job, Duncan was pretty much the only person for it. The first one is always the hardest but once it got up the rest went up much quicker and in the end, only a little touch up paint is necessary.
Duncan, bless his heart, put up 6 gray fabric panels in the edit suites yesterday. The acoustics in the new edit suites are surprisingly good already so the panels should only improve it more. And with the precision needed to do the job, Duncan was pretty much the only person for it. The first one is always the hardest but once it got up the rest went up much quicker and in the end, only a little touch up paint is necessary.
Saturday, June 13, 2009
Way Finding
Last week our way finding was ordered and it is scheduled to be delivered to us this Wednesday. In addition to the inside way finding we used the same design to make the sign that will go on the side of the building directing guests to the front entrance instead of the back. The goal of the way finding was two fold: 1. Make sure it works. No matter what it is, if people get lost or can't find their way to where they want to go, the way finding failed. 2. Make it cool. The last thing we wanted to do is have signage that is boring, it's just not us. I think you'll find that we definitely achieved goal #2, it remains to be seen if #1 was achieved. We posted samples of the way finding on the new home website www.ideasorlando.com/ideasnewhome. Click on the pictures tab and look for 06-12-2009.
Friday, June 12, 2009
Audio Progress & Parking Signage
The build out of the new Audio A mix room has been challenging. There's not enough space on this blog to tell you all the stories but trust me when I say as easy as the main building build out went, the audio build out has been that difficult, and we haven't even broken ground on the 6-8 week construction yet. However, we got the next set of prints this week and have a meeting scheduled with our contractor and architect for Monday. Based on the input of our contractor (Scott Greer, Greer Contracting Company), we can move to the next stage with our architect and him. What that means is that we can start narrowing in on total cost and make the necessary value engineering decisions as necessary. Our goal would obviously be to make any aesthetic alterations before we will modify the structural portion which could effect the soundness of the acoustics. Hopefully more progress next week.
The next thing we are making progress with is with the design, order and install of a sign on the side of our building that directs our guests/visitors/clients towards the front of the building to enter. It has been shocking how many people park on the side of the building and then walk towards the back of the building to get in. It has lead to a lot of awkward moments with clients knocking on the back door because it's locked unless you have a key card. Sign should be installed in about a week.
The next thing we are making progress with is with the design, order and install of a sign on the side of our building that directs our guests/visitors/clients towards the front of the building to enter. It has been shocking how many people park on the side of the building and then walk towards the back of the building to get in. It has lead to a lot of awkward moments with clients knocking on the back door because it's locked unless you have a key card. Sign should be installed in about a week.
Subscribe to:
Posts (Atom)